A current transformer (CT) is wired in series with the conductor and scales high current down to a 5 A or 1 A secondary. A potential transformer (PT), called a voltage transformer (VT) in IEC standards, is wired in parallel across the supply and scales high voltage down to a 100 V or 110 V secondary.
An AC energy meter needs both signals: it multiplies voltage and current into active power and integrates that power over time to register kilowatt-hours (kWh). Fit CTs when the current exceeds the meter’s direct rating, PTs when the voltage does, and typically both on medium-voltage feeders. The two transformers then need opposite secondary-circuit rules.
How Do a Current Transformer and a Potential Transformer Differ?
Both are inductive instrument transformers that isolate the primary circuit from the meter inputs, but their connection, turns ratio and normal secondary state are the reverse of each other.
| Parameter | Current transformer (CT) | Potential or voltage transformer (PT / VT) |
| Quantity measured | Alternating current | Alternating voltage |
| Primary connection | In series with the load conductor or busbar | In parallel, phase-to-phase or phase-to-neutral |
| Primary vs secondary turns | Fewer primary turns, more secondary turns | More primary turns, fewer secondary turns |
| Typical secondary rating | 5 A or 1 A | 100 V or 110 V line-to-line (57.7 V or 63.5 V phase-to-neutral) |
| Normal secondary state | Close to a short circuit through the low meter impedance | Close to an open circuit into the high meter impedance |
| Main secondary hazard | Opening the secondary under load | Short-circuiting the secondary |
| IEC standard | IEC 61869-2 (inductive CTs) | IEC 61869-3 (inductive VTs) |

Current Transformer 5 A or 1 A Secondary
A measuring CT acts as a current source driven by the primary load. A 400/5 A CT (ratio 80:1) delivers 5 A on its secondary when 400 A flows in the busbar.
- 5 A secondary: the usual match for CT-operated DIN-rail meters with a 5(6) A input (5 A basic current, 6 A maximum).
- 1 A secondary: the choice for long secondary runs, where cable losses at 5 A would add too much burden.
Voltage Transformer (PT) 100 V or 110 V Secondary
A PT steps the system voltage down by a fixed turns ratio and feeds the high-impedance voltage inputs of the meter, so its secondary current stays small.
- Three-wire systems: 100 V or 110 V line-to-line, the standard secondary values IEC 61869-3 gives for European practice.
- Four-wire (3P4W) systems: 57.7/100 V or 63.5/110 V, where 57.7 V is 100 V divided by √3.
Why Are CT and PT Wiring and Safety Rules Opposite?
A CT works into a near short circuit and a PT into a near open circuit, so their secondary protection and isolation rules run in opposite directions. Testing or isolating instrument-transformer circuits is work for qualified electricians, following the site’s isolation procedure for the primary circuit.

Series CT Wiring and Open-Circuit Risk
The primary load sets the CT current, whatever happens on the secondary side. In normal operation the secondary ampere-turns cancel most of the core flux. If the secondary is opened under load, all the primary ampere-turns become magnetising force, which saturates the core and induces hazardous peak voltages at the open terminals.
- Do not install ordinary fuses or disconnecting devices that could leave a current-output CT secondary open while primary current is flowing.
- Use approved CT shorting terminal blocks or test switches designed for safe meter testing and isolation, following the manufacturer’s instructions and the site’s electrical safety procedures.
Parallel PT Wiring and Short-Circuit Risk
A PT secondary behaves as a stiff voltage source limited mainly by its winding impedance. A short circuit across its terminals drives a high fault current that overheats the windings and can cause internal arcing.
- Provide appropriate primary and secondary protection for the PT circuits as specified by the switchgear design and applicable requirements.
- Do not short-circuit the PT secondary.
Shared Three-Phase CT and PT Wiring Checks
The protection rules are opposite, yet every three-phase CT and PT installation needs the same three checks before energising:
- Match each current input (I1, I2, I3) to its own voltage phase (U1, U2, U3), so that active power and power factor read correctly.
- Fit every CT with P1 towards the supply and P2 towards the load, with S1 and S2 wired the same way on each phase, so that import is not recorded as export.
- Follow the approved secondary-circuit earthing arrangement, the meter and instrument-transformer manufacturers’ wiring instructions, and applicable local requirements. Where secondary earthing is required, use the designated single-point connection and avoid unintended multiple earth connections.
When Does an Energy Meter Need a CT, a PT or Both?
Two thresholds decide the wiring: feeder current above the meter’s direct current rating calls for CTs, and system voltage above its voltage rating calls for PTs. A 3×230/400 V circuit up to 100 A can be wired straight into a 100 A direct-connected meter with no external transformers.
Low-Voltage High-Current CT-Only Metering
European 230/400 V feeders above 100 A stay within the meter’s voltage rating. The phase voltages connect straight to the meter, and only the current passes through CTs, usually with a 5 A secondary to match a 5(6) A meter input. Where a busbar is too wide for a CT window or the conductor cannot be disconnected, a Rogowski coil wraps around the conductor and measures AC current with no iron core to saturate. Fitting it still follows the site’s isolation procedure.

Medium- and High-Voltage CT-PT Circuits
Medium- and high-voltage feeders normally require instrument transformers or other approved sensing arrangements to provide compatible current and voltage signals to the energy meter.
- Three-phase four-wire systems: three-element metering typically uses three CTs and three corresponding phase-to-neutral voltage measurements, provided through suitable VTs where required.
- Three-phase three-wire systems: two-element Aron metering may use two CTs and two line-to-line voltage measurements, with suitable VTs where required.
The system earthing arrangement, transformer connections, insulation requirements and meter wiring must follow the approved switchgear design and applicable metering requirements.

Combined CT and PT Ratio Calculation
With both transformers fitted, the primary multiplier is the CT ratio times the PT ratio.
- Worked example: a 1000/5 A CT (200:1) with a 10 kV/100 V PT (100:1) gives a multiplier of 20,000, so 0.5 kWh measured on the secondary side equals 10,000 kWh on the primary side.
- Programming check: confirm whether the meter applies both ratios internally and displays primary kWh, and that the product of the two ratios stays within the meter’s programmable maximum.

What Accuracy, Burden and Compliance Limits Apply to CT and PT Metering?
Scaling the signals to 5 A and 100 V does not by itself make the metering accurate or legally valid. The result depends on the IEC 61869 accuracy classes, the burden on each secondary circuit and what the MID covers.
CT and PT Metering Accuracy Under IEC 61869
IEC 61869-2 covers inductive CTs for rated frequencies from 15 Hz to 100 Hz, and IEC 61869-3 covers inductive VTs; the two standards treat light load differently.
- Inductive CTs (IEC 61869-2): measuring classes such as 0.2, 0.5 and 1 set error limits from 5% to 120% of rated current.
- Special CT classes 0.2S and 0.5S: the limits extend down to 1% of rated current, which suits billing points with light overnight loads.
- Inductive VTs (IEC 61869-3): measuring classes 0.1 to 3 set error limits from 80% to 120% of rated voltage, and the standard has no S class.
CT and PT Secondary Burden and Cable Limits
Burden is the total load on the secondary terminals in VA or ohms: the meter input, the terminals and the cable run out and back.
- Cable loss: cable burden follows I²R, so a 5 A loop adds 25 times the cable burden of a 1 A loop on the same cable ((5 ÷ 1)² = 25).
- Burden range: IEC 61869-2 and IEC 61869-3 state each accuracy class over a defined burden range, not at any burden.
- Under-burden: a digital meter on short leads can load a CT or VT well below its rated burden, so specify a rated burden or extended burden range that matches the real loop.

EU MID Scope for CT and PT Meters
For regulated tenant sub-billing and customer invoicing in the European Union, check whether the Measuring Instruments Directive (MID) applies to the billing and what it covers before buying hardware.
- Meter scope: Annex V (MI-003) of Directive 2014/32/EU covers active electrical energy meters and states that it does not cover the instrument transformers used with them.
- National rules: confirm any separate approval or verification requirements for external CTs and VTs in the target market. Great Britain and Northern Ireland have different applicable metering arrangements, which should be checked separately.
Which YTL DIN-Rail Meters Support CT and PT Inputs?
We supply 54 mm (three-module) DIN-rail energy meters for 5(6) A CT inputs with PT ratio settings, for Rogowski coils, and for direct connection up to 100 A. Our catalogue does not include voltage transformers, so specify the PT with the switchgear.
| YTL model | Connection and wiring | Current input | CT and PT ratio range | Interface and accuracy |
| DEM3K302 | External CT and PT; 3P4W 3×57.7/100 V to 3×230/400 V; 3P3W (Aron) 3×100 V to 3×400 V | 5(6) A CT (Ib 5 A, Imin 0.05 A) | CT up to 2000:1; PT up to 350:1; CT × PT up to 350,000:1 | RS485 Modbus RTU and DL/T 645-2007; ≤75 ms RS485 communication refresh; specified Class 0.5S active-energy accuracy; EN 50470-3:2022 Class C EU type-examination coverage; 4-tariff TOU with real-time clock |
| DEM3K304 | External CT and PT; same voltage ranges and wiring as the DEM3K302 | 5(6) A CT (Ib 5 A, Imin 0.05 A) | CT up to 2000:1; PT up to 350:1; CT × PT up to 350,000:1 | Wired M-Bus (EN 13757-3, 2400 bps); Class 0.5S (IEC 62053-22); 4-tariff TOU |
| M60333 | External Rogowski coil; direct voltage or PT; 3P4W | Rogowski, Ib 20 A, Imax 600 A (up to 2,400 A by coil) | PT up to 350:1; the rated voltage range does not reach 57.7/100 V or 63.5/110 V, so confirm the PT secondary with us | RS485 Modbus RTU and DL/T 645-2007, ≤75 ms RS485 communication refresh; specified active-energy accuracy: Class 1; Class B as listed in the product specification; 4-tariff TOU |
| DEM3A302 | Direct connection; 3P4W or 3P3W up to 3×230/400 V | Direct, up to 100 A | Not applicable | RS485 Modbus RTU and DL/T 645-2007, ≤75 ms RS485 communication refresh; Class 0.5 (IEC 62053-21), Class C (EN 50470-3); 4-tariff TOU |

Scope Notes and MID Certificate Verification
Check the model list on the certificate before ordering meters for billing, and ask us for the full certificate and the declaration of conformity for your variant. Our certificates by model series are a starting point for that check.
- The DEM3K001, DEM3K202 and DEM3K302 are covered by EU type-examination certificate 0598/MID/B/26/010 under the MID (Module B), issued by SGS Fimko Oy, Notified Body 0598.
- The DEM3A001, DEM3A202 and DEM3A302 are covered by certificate 0598/MID/B/26/011 from the same notified body.
- For the M-Bus DEM3K304, ask us for the certificate that covers it before planning billing use.
Module B covers the examined meter type and does not by itself establish completion of the full conformity assessment. For regulated billing applications, confirm the applicable conformity documentation and EU Declaration of Conformity for the supplied instrument, together with any separate national requirements for external CTs and VTs.
Project Checklist for YTL Engineering
Send these details with your request for model matching or a quotation:
- Primary voltage and PT secondary rating (57.7/100 V, 63.5/110 V, 100 V, 110 V, or direct 230/400 V)
- System wiring (3P4W or 3P3W Aron)
- Maximum primary current, sensor choice (5 A CT or Rogowski coil) and planned CT and PT ratios
- Communication (RS485 Modbus RTU, M-Bus or SO pulse output) and tariff rules
- Destination country, and whether the readings serve internal monitoring or regulated billing
FAQ
Can CTs or PTs Measure Steady DC Circuits?
No. Inductive CTs and PTs need a changing magnetic flux, so a steady DC current or voltage induces no continuous output, and a DC bias pushes the iron core towards saturation. PV strings, battery banks and DC fast chargers need a DC energy meter built around a shunt or a DC current sensor, with accuracy classes set by IEC 62053-41.
Can an Energy Meter Share Existing Protection CTs or PTs?
A protection CT core such as 5P20 should not automatically be used for precision energy metering. The designation specifies a 5% composite-error limit at 20 times rated primary current under the applicable rated-burden and test conditions. Its accuracy characteristics may not satisfy the required metering accuracy across the normal operating range. During faults, the secondary current may also exceed the energy meter’s permitted input limits. Where appropriate, specify a separate metering core or a suitable dedicated metering CT. Sharing a VT secondary may be acceptable if the voltage accuracy, combined burden, circuit protection and applicable metering or sealing requirements are satisfied.
What Happens If You Connect 1 A CTs to a 5 A Meter?
A 1 A CT uses a smaller portion of the nominal input range of a meter rated for 5 A CTs. For example, the DEM3K302 specifies a 5(6) A CT input and a minimum current of 0.05 A. This corresponds to 1% of a 5 A secondary rating but 5% of a 1 A secondary rating. However, this comparison does not establish compatibility or guaranteed accuracy with a 1 A CT. The meter’s supported ratio configuration, input characteristics and accuracy under the intended operating conditions must be confirmed. For the DEM3K302, select a compatible 5 A CT secondary unless YTL confirms another supported configuration for the exact model.
Source
- IEC 61869-2:2012 Instrument transformers, Part 2: Additional requirements for current transformers, International Electrotechnical Commission: scope (inductive CTs, 15 Hz to 100 Hz), measuring classes including 0.2S and 0.5S, protection classes such as 5P20, and burden ranges.
- IEC 61869-3:2011 Instrument transformers, Part 3: Additional requirements for inductive voltage transformers, International Electrotechnical Commission: VT measuring classes, the 80% to 120% voltage range, burden ranges and standard secondary voltages.
- IEC 62053-41:2021 Electricity metering equipment, Particular requirements, Part 41: Static meters for DC energy (classes 0,5 and 1), International Electrotechnical Commission: accuracy classes for static DC energy meters.
- Directive 2014/32/EU on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (recast), EUR-Lex: Annex V (MI-003) covers active electrical energy meters but not instrument transformers.

