...

Quality Assurance

Energy Meter Quality Assurance System

YTL controls energy meter quality from incoming materials and first article approval to in-process control, calibration, final verification and outgoing inspection.

IQC FAI IPQC FQC OQC

Quality Process

One controlled flow from materials to shipment

IQC

Incoming Control

Materials, PCBs, terminals, housings, sensors, displays and key components are checked before production.

FAI

First Article

First units are verified against approved model, firmware, label, wiring and packaging requirements.

IPQC

In-Process

Process checks cover PCB assembly, product assembly, programming, calibration and function testing.

FQC

Final Control

Metering accuracy, functions, communication, appearance and configuration are verified before release.

OQC

Outgoing

Shipment checks cover model, quantity, serial number, accessories, documentation and packaging.

CAPA

Corrective and preventive improvement

Nonconformance analysis, quality data review and improvement actions support stable repeat production.

Inspection Focus

What YTL checks during production

Materials & Components

Key components are checked against approved specifications before production release.

  • PCB and chips
  • Terminals and sensors
  • Display, relay and housing

Appearance & Mechanics

External structure and assembly details are reviewed before shipment.

  • Housing and terminals
  • DIN-rail installation
  • Labels and dimensions

Accuracy & Electrical

Test points and acceptance criteria vary by product model and applicable standard.

  • Active / reactive energy
  • Voltage, current and power
  • Starting current and meter constant

Function & Communication

Depending on model and project configuration.

  • LCD, keys, pulse and relay
  • RS485, Modbus, DLMS/COSEM
  • Wireless and data reading

Safety & Configuration

Production-stage checks cover basic safety, rated parameters and project configuration.

  • Rated parameters
  • Firmware and address
  • Wiring and configuration files

Label & Packaging

Important for ODM projects and repeat delivery consistency.

  • Model, serial number and barcode
  • Customer brand and packaging
  • Manuals and shipment files

Selected products and project configurations may undergo EMC, environmental, safety and reliability verification according to applicable requirements.

View Laboratory Testing Capabilities

Project Quality

Project, batch and traceability control

01 / Project Baseline

Approved requirements become the production reference

For ODM and project orders, the approved sample, specification, drawing, firmware, label and packaging files form the baseline before batch release.

Approved sample

Confirmed physical sample and first article reference.

Technical files

Specification, wiring, firmware and communication settings.

Label and packaging

Customer brand, barcode, manuals and carton requirements.

Release review

Critical requirements are checked before production starts.

Capability Gateway

Continue your audit path

CNAS-Accredited Laboratory

Metering, EMC, environmental, communication, safety and reliability verification within applicable scope.

View Laboratory Capability

Certificates by Model

Product- and model-specific certificates, declarations and compliance documents.

View Certificates

Need a Smart Metering Solution for Your Project?

Tell us your requirements and our team will provide a professional solution and quotation within 24 hours.

Quick ResponseReply within 24 hours
Expert SupportEngineer-to-engineer
Custom SolutionsProject-ready from spec
Long-term PartnerSingle point of contact
Add Project Details (Optional)

Share technical or purchasing details to help us recommend the right model faster.

By submitting this form, you ask YTL to use your details to respond to your inquiry. Privacy Policy

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.